The Goliat oil and gas field, 105 km off the Northern coast of Norway, was discovered in 2000 and is operated by Eni Norge. The production of oil and gas from a FPSO (floating, production, storage and offloading) platform started in 2016.
Siirry sivulleThe Goliat oil and gas field, 105 km off the Northern coast of Norway, was discovered in 2000 and is operated by Eni Norge. The production of oil and gas from a FPSO (floating, production, storage and offloading) platform started in 2016.
Siirry sivulleThe Horns Rev 3 wind farm is located in the North Sea, about 30 km off the western-most point of Denmark, Blåvands Huk, and not far from the city of Esbjerg. The 400 MW (megawatt) wind farm has the capacity to supply electricity to around 400,000 households.
Siirry sivulleOur pioneering HVDC transmission cable system was laid in 1953, between Västervik and Ygne. The link had a rated voltage of 100 kV (kilovolt) and a transmission capacity of 20 MW (megawatt).
Siirry sivulleThe Caithness-Moray project represents a £1.1bn capital investment by SSEN, centred on a submarine cable capable of carrying up to 1,200MW beneath the Moray Firth.
Siirry sivulleCovering a total of 623 kilometers, NordLink is an HVDC (high-voltage direct current) transmission link which will increase energy security in both countries, Norway and Germany.
Siirry sivulleCovering a total of 623 kilometers, NordLink is an HVDC (high-voltage direct current) transmission link which will increase energy security in both countries, Norway and Germany.
Siirry sivulleQaddy® er en integreret kabelrulle-, pay-off- og tromlevogn, der forbedrer arbejdsforholdene for elektrikere betydeligt med sit revolutionerende ergonomiske design.
Siirry sivulleQaddy® is an integrated cable reel, pay-off and drum trolley, which significantly improves working conditions for electricians with its revolutionary ergonomic design.