400 kV High Voltage underground project - 80 km total length
Client
Total cable route length
Location of the project
Duration
Quantity of order
The Aliveri power plant on the island of Euboea was to be interconnected with the mainland grid.
NKT provided everything from an efficient cable system to horizontal drilling under the seabed.
Creating the Afrati-Avlida link